ISTRABENZ, INSTALACIJA d.o.o., Koper, SLOVENIJA, 1996-2005
Design for the tanks:
- 3xV=60.000 m3 - R-8, R-17 i R-19 (steel tank dike, Al cupola, inner Al floating cover)
Reconstruction of the tanks:
in-building of Al inner floating cover
- R-1, 2, 3, V=4.700 m3 svaki
- R-10, 11, V=6.100 m3 svaki
in-building of Al selfsupportive cupola roof and Al inner floating cover
- R-4, V=4.900 m3
- R-6, 7, V=6.300 m3 each
- R-14, V=6.500 m33
- R-15, 16, V=6.700 m3 each
- R-13, V=9.500 m3
- R-12, V=11.500 m3
- R-9, V= 40.000 m3
Design for the truck tank loading unit:
5 islands, 20 measuring units, bottom loading, closed fully-automated system for fuel loading, unit for depresant and colour
Design for the rail tank loading/unloading unit:
- V=2.000 m3 s VRU (unit for processing hydrocarbon vapours)
Tanker
Design for the PIG pipeline:
closed system for two pig pipelines dimension 16", route length cca 2,7 km (more mediums through the same pipeline)
The complete design documentation for manipulative pipelines and accessory infrastructure for the above stated units (fire protection system, civil engineering units, electrical design, designs for measurement and regulations, environmental protection.)
PHOTOGRAPHS >>>